Office of Environmental & Regulatory Compliance Requirements (ERC) for College of Engineering (COE) Senior Design Projects

All projects must be registered with the Director of Engineering laboratories:

  • Dr. Ronnal Reichard
  • (321)674-7349
  • Olin Engineering Building Room 356B
  • reichardr@fit.edu

Safety Plan 

 Projects are required to submit and revise a safety plan with the ERC until approved, before any project material may be purchased or construction may begin. 

Test Plan

 Projects are required to have a test plan approved by the advising faculty for the project, Dr. Reichard and the ERC before any testing of a project may commence.

Showcase

Projects are expected to present/display at the Northrup/Grumman Showcase in April. Project displays must conform to all applicable Federal, State, County & City Codes and regulations. Project displays must also meet all requirements of the chosen campus venue. Displays must be coordinated thru Dr. Reichard. Displays will be inspected by the ERC the day of showcase. Display modifications required by the ERC to meet compliance requirements per the onsite inspection are mandatory and may result in changes to the display. It is highly recommend that the ERC (erc@fit.edu) is consulted about your display well before the showcase to prevent and unnecessary surprises.

Disposal Plan

Projects must have a written plan approved for final disposition of their project. This plan will include how University assets used in the project will be disposed or re-used in the future after the project academic term is completed. Projects without an approved plan may be summarily disposed at the discretion of the ERC/COE.